{{ h1Prefix }} Masons {{ productData.product_name }} UNI PRO Flexible Air Barrier
Model: {{productData.model}}
Pre-Sale {{ productData.display_label || 'Unavailable' }}{{ levelLabels[lvl] }}:
Stock by Location:
A heavy-duty flexible wall underlay that gives early enclosure to builds, allowing work to continue on the inside (for up to 150 days), without waiting for the cladding to be complete.
Key Benefits
-
Helps keep construction moving. Once installed it allows the continuation of internal work on the build, without cladding in place for up to 150 days after installation.
-
Once installed, UNI PRO is a secondary line of defence against moisture over the life of the building.
-
Highly breathable, passing vapour from the inside of the building out.
-
A fraction of the cost of rigid air barriers (materials and labour) whilst having most of the benefits.
-
22% thicker than UNI and much thicker and stronger than standard building paper/wrap.
-
Quick and easy installation with many resources to assist first-time users.
-
Codemark Certified.
Physical Attributes
-
A non-woven, absorbent, water-resistant, synthetic wall underlay.
-
Comprised three polypropylene layers: two outer layers of non-woven polypropylene with a middle layer of a functional-technical film.
-
Has a blue front face and a white rear face - and a middle membrane which is dark grey. Both sides of the sheet have a fine embossing pattern. The sheet is 2.74 metres wide and marked UNI PRO Flexible Air Barrier.
Scope of Use
Masons UNI PRO Flexible Air Barrier is certified for use as a wall underlay and air barrier on buildings:
a) within the scope limitations of:
i. NZBC Acceptable Solution E2/AS1, Paragraph 1.1 with regards to building height and floor plan area for timber-framed construction; or
ii. NZBC Acceptable Solution E2/AS4 with regards to building height and floor plan area for light-steel framed construction, and
b) situated in wind zones (as defined in NZS 3604:2011) up to and including ‘Extra High’, provided stud and fixing centres are no greater than specified in the Masons UNI® PRO Flexible Air Barrier Design and Installation Guide V1.0, November 2021, and
c) with absorbent or non-absorbent wall claddings directly fixed to the frame, or installed over an 18mm minimum drained cavity; or with masonry veneer, in accordance with NZBC Acceptable Solution E2/AS1 for timber-framed buildings or NZBC Acceptable Solution E2/AS4 for steel-framed buildings, and
d) where the underlay is not exposed to view in an occupied space.
Masons UNI PRO Flexible Air Barrier shall be:
a) installed in accordance with the MASONS UNI® PRO Flexible Air Barrier Design and Installation Guide V1.0, November 2021, and
b) separated from fireplaces, heating appliances, flues and chimneys in accordance with the requirements of NZBC Acceptable Solutions C/AS1 and C/AS2, Paragraph 7.5.9 for the protection of combustible materials, and
c) protected from sunlight within 150 days
Contribution to compliance with Building Code clause H1.3.1(b) is conditional on
a) the element incorporating UNI PRO Flexible Air Barrier being part of the thermal envelope of the building, and
b) horizontal and vertical laps being securely taped.
Here is the brand introduction content...
Here are the parts content...
Related Products
{{ rp.product_name }}
Sorry, Product Not Found
The product you are looking for may have been removed or does not exist. Please return to the product list or try searching for another product.